Introduction
Clay Mills in Staffordshire is the Midlands' largest filter works, serving a population equivalent of 400,000. During refurbishment, movement and dummy joints within the water treatment beds were found to be failing and leaking to ground, requiring an effective containment solution across a five-football-pitch-sized area.
Our Solution
UCL Ltd developed a solution to reinstate watertight integrity using a specialised proprietary polyurea spray coating. Damaged soft joints were removed and high-pressure water used to expel contamination and surface laitance. Once dry, joints were fitted with backing rods and a 5mm recess cut, with a quick-setting primer and fine grit applied to enhance adhesion before a liquid soft joint was applied. The specialised polyurea, offering over 300% elasticity, was then sprayed over each joint, allowing it to flex with concrete movement while avoiding the cost of lining the entire structure.
Key Benefits
- Over 2,000m of movement joints and 2,000m of dummy crack repairs completed within four months
- Specialised polyurea provides over 300% elasticity to accommodate structural movement
- Rapid application and drying times enabled a fast return to service
- Environmentally friendly solution with no VOCs
- Significant cost reduction compared to full-area lining or concrete replacement
- 50-year guarantee provided for the completed works
Conclusion
UCL Ltd delivered this project on time and within budget. By utilising specialised polyurea overbanding, UCL Ltd reinstated immediate watertight integrity and provided a long-term, guaranteed solution that outperformed traditional lining methods in both flexibility and cost-effectiveness.
Our services.
The disciplines behind work like this — browse by what you need.
Industrial Coatings
UCL Ltd delivers industrial coatings through Ultimate Coatings, protecting tanks, pipework, concrete and structural steel against corrosion and chemical attack.
Civils & Mechanical Engineering
Mechanical installations and civil engineering works delivered by one accountable contractor, from design to completion.
Concrete Repair & Anti-Carbonation Coatings
UCL Ltd repairs and protects concrete infrastructure showing cracking, spalling or carbonation damage, restoring structural integrity without full replacement.
More case studies.
Other projects from across the UK.
Anaerobic Digester Asset Refurbishment
UCL Ltd delivered structural refurbishment and gas-leak sealing of asset-critical, egg-shaped anaerobic gas digesters, securing a projected 50-year design life.
Potable Water Reservoir Joint Remediation — Primrose Hill
A rapid, out-of-hours response to failed bitumen joints at a Primrose Hill clean water reservoir, restoring watertight integrity without disrupting supply.
Remote Robotic UHP Water Jetting for Complex Digester Cleaning
UCL engineered a remote-operated robotic UHP water jetting solution to clear an embedded gas leak obstruction in a confined-space digester, eliminating manual handling risk.