Concrete Ring Interceptor Tank Renovation
Introduction
UCL Ltd was contracted to renovate a concrete ring interceptor tank that had suffered significant substrate degradation and exposed reinforcement bar. The structure required urgent remedial works to restore structural integrity and provide long-term chemical resistance, whilst minimising operational downtime within a live water treatment environment.
Our Solution
The tank was pumped down to its lower limits and all high-level inlets were capped. The lowest inlet remained open to prevent hydraulic overload further downstream. High-pressure water jetting (HPWJ) at 20,000 psi using a rotary jetting head was deployed to remove all weak and degraded concrete, exposing sound substrate and any compromised reinforcement bar. Following inspection, rebar and substrate losses were confirmed within acceptable limits. The surface was then treated with an acid etch followed by an antimicrobial wash to neutralise bacteria and ensure optimum bond integrity. A 6 mm application of Ultracoat pure epoxy coating system was then spray-applied to the full internal surface area, providing a seamless, chemical-resistant lining compliant with potable water standards.
Key Benefits
- Full works completed within a single 14-hour shift (06:00–20:00), minimising service disruption
- 20,000 psi HPWJ ensured thorough substrate preparation without mechanical damage to sound concrete
- Antimicrobial pre-treatment eliminated biological contamination risk prior to coating application
- 6 mm Ultracoat epoxy system delivers long-term chemical and abrasion resistance
- Lowest inlet maintained live throughout, preventing upstream hydraulic issues
- Tank returned to service same day — zero extended outage
Conclusion
The interceptor tank was fully renovated and returned to service within a single working day. This project demonstrates UCL Ltd's capability to deliver complex tank lining works within live water treatment infrastructure under strict operational and environmental constraints.
Our services.
The disciplines behind work like this — browse by what you need.
Industrial Coatings
UCL Ltd delivers industrial coatings through Ultimate Coatings, protecting tanks, pipework, concrete and structural steel against corrosion and chemical attack.
Civils & Mechanical Engineering
Mechanical installations and civil engineering works delivered by one accountable contractor, from design to completion.
Concrete Repair & Anti-Carbonation Coatings
UCL Ltd repairs and protects concrete infrastructure showing cracking, spalling or carbonation damage, restoring structural integrity without full replacement.
More case studies.
Other projects from across the UK.
Anaerobic Digester Asset Refurbishment
UCL Ltd delivered structural refurbishment and gas-leak sealing of asset-critical, egg-shaped anaerobic gas digesters, securing a projected 50-year design life.
Potable Water Reservoir Joint Remediation — Primrose Hill
A rapid, out-of-hours response to failed bitumen joints at a Primrose Hill clean water reservoir, restoring watertight integrity without disrupting supply.
Remote Robotic UHP Water Jetting for Complex Digester Cleaning
UCL engineered a remote-operated robotic UHP water jetting solution to clear an embedded gas leak obstruction in a confined-space digester, eliminating manual handling risk.