Introduction
Barclays required compliant secondary containment for two generator rooms in Knutsford — one housing dual generators with unsealed bases and electrical channels, the other containing three diesel storage tanks with no containment measures. Both installations required bund systems capable of holding 110% of stored fuel volume in accordance with The Control of Pollution (Oil Storage) (England) Regulations 2001.
Our Solution
UCL surveyed and calculated the required bund volumes per the Oil Storage Regulations, marking out containment zones before diamond-grinding all surfaces to remove laitance and debris. Modular GRP bund sections were mechanically fastened to the floor, shaped where necessary to accommodate generator stand profiles, with all joints sealed using mastic. A specialist primer was applied to both the prepared concrete and GRP inner faces prior to spray application of pure polyurea across approximately 200m². The polyurea membrane provides hydrocarbon resistance and continuous containment for up to 48 hours. Anti-slip coating was applied to polyurea walkway zones, with anti-slip tape installed on GRP edges for physical demarcation and safety.
Key Benefits
- Fully compliant with The Control of Pollution (Oil Storage) (England) Regulations 2001 — 110% containment capacity achieved
- Monolithic polyurea membrane provides hydrocarbon resistance for up to 48 hours' continuous submersion
- GRP bund profiled to fit complex generator stand contours, installed with all plant in situ
- Electrical channels protected from submersion in flammable liquid in the event of a fuel spill
- Anti-slip demarcation applied to walkways for safe egress during spillage events
- Eliminates risk of Environment Agency enforcement action and associated fines
- 10-year warranty on completed installation
- Approximately 200m² treated across two separate generator rooms in a single project
Conclusion
UCL delivered a fully compliant, warranted bund lining system across both generator rooms with no plant removal required. The project demonstrates UCL's capability to design and install secondary containment solutions that meet regulatory requirements in live, high-risk commercial environments.
Our services.
The disciplines behind work like this — browse by what you need.
Industrial Coatings
UCL Ltd delivers industrial coatings through Ultimate Coatings, protecting tanks, pipework, concrete and structural steel against corrosion and chemical attack.
Civils & Mechanical Engineering
Mechanical installations and civil engineering works delivered by one accountable contractor, from design to completion.
Concrete Repair & Anti-Carbonation Coatings
UCL Ltd repairs and protects concrete infrastructure showing cracking, spalling or carbonation damage, restoring structural integrity without full replacement.
More case studies.
Other projects from across the UK.
Underwater Film Production Tank Remediation
UCL resolved severe subfloor deterioration and water leakage in a major film studio's underwater filming tank with a durable, seamless polyurea lining system.
Airtight Coating for Durham History Centre
Durham History Centre, housed within the Grade II listed Mount Oswald Manor House, required a precisely controlled environment to protect sensitive historica...
5 Key Factors of Energy Efficient Design
UCL Ltd has developed specialist expertise in airtight coating application, a critical component of Passive House and energy-efficient construction.