Rapid Structural Remediation & DWI-Compliant Sealing — Rodbourne Balance Tank
Introduction
UCL was engaged to address a critical asset failure at Rodbourne, where the grout seals on a balance tank's inlet pipes had failed, risking leakage and operational downtime. UCL's technical team deployed rapidly to assess the structural damage and restore long-term asset integrity under tight time constraints.
Our Solution
UCL's engineering team began by breaking out all defective materials, making precise square cuts to create a deep, keyed surface for optimal repair adhesion. A hydrophilic sealant was installed around all pipe penetrations prior to structural reinstatement, ensuring a robust water stop. High-performance, DWI-approved cementitious compounds were then hand-applied to repair the complex junctions around the inlet pipework. To correct widespread structural degradation, all uneven, delaminated sections along the entire wall profile were stripped back, resulting in a uniform finish. Following the repairs, the balance tank was washed and chlorinated, and legacy staining left by a previous contractor was removed, leaving a clean, compliant asset.
Key Benefits
- Rapid asset reinstatement — all emergency remedial and rectification works completed within a strict 48-hour window
- Regulated compliance — high-specification, DWI-approved cementitious materials meeting stringent water industry standards
- Structural integrity restored — delamination and substrate defects eliminated, with an engineered, uniform finish to the tank wall
- Comprehensive remediation — legacy staining from previous contractor workmanship extensively cleaned and removed
Conclusion
By combining reactive engineering agility with high-specification materials, UCL resolved the structural failures at Rodbourne. The rapid 48-hour turnaround minimised critical asset downtime, returning the balance tank to active service in a fully compliant, secure and structurally sound condition.
Our services.
The disciplines behind work like this — browse by what you need.
Industrial Coatings
UCL Ltd delivers industrial coatings through Ultimate Coatings, protecting tanks, pipework, concrete and structural steel against corrosion and chemical attack.
Civils & Mechanical Engineering
Mechanical installations and civil engineering works delivered by one accountable contractor, from design to completion.
Concrete Repair & Anti-Carbonation Coatings
UCL Ltd repairs and protects concrete infrastructure showing cracking, spalling or carbonation damage, restoring structural integrity without full replacement.
More case studies.
Other projects from across the UK.
Anaerobic Digester Asset Refurbishment
UCL Ltd delivered structural refurbishment and gas-leak sealing of asset-critical, egg-shaped anaerobic gas digesters, securing a projected 50-year design life.
Potable Water Reservoir Joint Remediation — Primrose Hill
A rapid, out-of-hours response to failed bitumen joints at a Primrose Hill clean water reservoir, restoring watertight integrity without disrupting supply.
Remote Robotic UHP Water Jetting for Complex Digester Cleaning
UCL engineered a remote-operated robotic UHP water jetting solution to clear an embedded gas leak obstruction in a confined-space digester, eliminating manual handling risk.